Thursday, February 24
The bottom line of the trigger sheet has said Dec-onward history not reviewed for a week. Marisol wrote it there herself on the 17th. Nobody else has touched it, and at 13:10 on a day shift with nothing tripping she decides that's the reason it's still there.
She pulls the one-minute revenue-meter export for F6 from December 6, the first night of the training run, to February 16, the last night under the old procedure. The file is 104,000 rows. She doesn't ask the scheduler for its own history, because the scheduler would hand back the campus's account of what the campus did. The meter belongs to the utility, and that's the record she wants.
The filter is simple. Any drop of more than 10 MW that holds at least two minutes, with no breaker operation on the sequence-of-events list for the same minutes. Seventy-three days at four checkpoints a day is 292. The filter returns 286.
She doesn't move on with six missing. If six checkpoints didn't happen, that's information. If they happened and the filter missed them, the filter is wrong and so is everything it found. She opens Trey's tenant log, the one the campus shares with the control room under the interconnection agreement, and scrolls to January. The run paused on January 7 at 19:40 for a cluster repair and resumed on the 9th a little after 08:00. A day and a half, six checkpoints. She writes 6 = Jan 8 pause, tenant log in the margin and the count closes.
Then she lines the 286 dips against the QSE's hourly offer sheet. That's the part she's been putting off. In forty-one of them, F6 was offered to ERCOT as 30 MW of interruptible reserve. In each of those forty-one, for two to five minutes, the load you could actually drop was about 12 MW. The training job had already dropped the rest while it wrote its checkpoint to storage.
No deployment was called during any of them. Nothing failed. The offer was still wrong for those minutes.
She could put a dollar figure on it. The settlement prices are a click away and the arithmetic would take ten minutes. She doesn't do it. An estimate from the control room would end up quoted in someone else's email as the answer, and the answer belongs to the QSE's compliance desk. She builds the list instead: forty-one rows, each with date, meter start and end minute, low MW, and offered MW for that hour, all in meter time, because the campus clock runs eleven seconds ahead and she's tired of arguing about edges.
Her note to Corinne is three sentences.
History reviewed, Dec 6 to Feb 16. 41 checkpoint dips overlapped hours F6 was offered; none overlapped a deployment. Six missing checkpoints are the Jan 8 pause per tenant log.
On the trigger sheet she crosses out not reviewed, writes reviewed 2/24, MV, list to QSE, and initials it. The crossed-out line looks better than the clean one did. Outside the window the campus cooling towers are throwing a long white plume south over the scrub, the way they do when the training block runs flat out.
Saturday, February 26
The first T-15 notice arrives at 02:35.
She asked for it on Wednesday: a line from the campus scheduler to the control room and the QSE fifteen minutes before each checkpoint. Trey said the scheduler agent could do it without a code change, since it already predicts its own checkpoints to stage the storage writes. The line lands in both queues at once.
F6 checkpoint expected 02:50, meter time, est. load 12 MW for 3 min.
It reads like an instrument and it's really a forecast. Marisol leaves the armed window where she set it on the 22nd, 02:48 to 03:00, reserve pulled before the dip and not after. She puts the one-minute meter trend on the left monitor, the notice on the right, and drinks the coffee that's been going cold since two.
The load holds near 31 MW through 02:47. The room is quiet except for the HVAC and the pager clipped to Dwayne's belt across the room, which he keeps on vibrate and which buzzes against the desk leg every few minutes for somebody else's feeder. At 02:48 the F6 trace bends down. The 02:49 bin reads 13.
Two minutes before the notice said.
It stays low through 02:52 and is back at 30 by 02:54. So the scheduler got the depth right and the length about right, and it was early on the start. That's the one number she'd use.
She opens Trey's tenant log for the hour before. The scheduler predicts the checkpoint from step count: so many steps per minute, so many steps until the next save. At 02:20 two steps ran slow, which should have pushed the checkpoint later. Instead the job skipped an evaluation pass to catch up, and skipping the pass pulled the checkpoint forward. The scheduler knew about the slow steps. It didn't know about the skip.
If she'd trusted the notice and narrowed the armed window to start at 02:50, the QSE would have been offering 30 MW for a minute when 13 was real. One more row like the forty-one she sent Corinne on Thursday, except this time with a warning on file that said otherwise.
She writes under Wednesday's line on the trigger sheet:
2/26 first T-15 notice: said 02:50, dip began 02:48. Notice is a forecast. Meter trigger stays the authority; do not shrink armed window to notice.
Then she sends Trey one question in the ticket. She keeps it from sounding like a complaint, because he did what she asked inside three days.
Can the notice carry a range instead of a minute?
Monday, February 28
He answers Sunday afternoon in writing, and she calls him at 01:10 anyway, before the F6 window opens. Some things she wants to hear in a voice.
"Yes," Trey says. "It already knows how long every step has run for the last hour. It can give earliest and latest instead of a point. Saturday it would have said 02:47 to 02:52."
"And the dip was 02:48."
"Inside."
"What happens when it skips an eval pass again? Does the range move early, or does it just get wider?"
There's a pause on the line. She can hear his keyboard and, under it, a fan that sounds like the edge of a server hall.
"Right now it only widens," he says. "The skip wasn't in the model. I'm putting it in this week. A skip pulls the earliest forward."
She tells him what she'll do with the range and what she won't, because if she doesn't say it now, someone will decide later that she agreed to more. The QSE gets the earliest time, because that's when reserve has to stop counting. The armed window on her sheet stays 02:48 to 03:00 until the range has held for fourteen nights. Even then she'll move only the start, never the end.
"If the notice is early, I lose a few minutes of reserve," she says. "If it's late, we're offering thirty megawatts that's already gone. I only care about one of those."
"I'll send both times in meter time," Trey says. "Nobody has to convert."
After she hangs up she adds a line:
2/28 Trey: notice to carry earliest/latest start (meter time), skipped-pass correction this week. QSE uses earliest. Armed window unchanged pending 14 nights.
At 02:46 the notice comes in as a single minute again, 02:51, because the change isn't live yet. The dip starts at 02:50. She logs it next to Saturday's. A minute early this time instead of two. She notices she's pleased by that and stops herself, because one minute on one night is nothing to be pleased about.
Tuesday, February 29
Trey's change goes live a day early. The notice comes in at 02:31 as two times for the first time.
F6 checkpoint window: earliest 02:45, latest 02:50, meter time. est. load 12 MW, 3 min.
She picks up the desk phone to the QSE. The operator on tonight is someone she hasn't worked with, a younger voice, and he hasn't seen the format.
"Is 02:45 when the dip starts?"
"It's when the reserve stops counting," she says. "The dip can be any time after that."
"So I pull it at 02:45 even if the dip is at 02:50."
"Yes."
"And if it's at 02:44?"
"Then the notice was wrong, and you call me, and I write it down."
The call takes four minutes. She writes that down too. The notice buys fifteen minutes, and four of them just went to explaining what the notice means. Next time it might be a QSE operator who doesn't pick up for three rings, or the bottom of the hour when every desk in the state is reading a dispatch. She writes QSE call 4 min, needs a one-line script and keeps going.
The dip starts at 02:47 on the meter. Two minutes after earliest, three before latest. Inside the range the first time out. She doesn't let herself make anything of it. One night is one night.
She checks the one thing Trey said would change. In the tenant log the job skipped an evaluation pass at 02:12, and in the scheduler's 02:20 preview the earliest time jumped about a minute forward. That's what the fix was supposed to do, and it did.
Then she looks at her own sheet and sees the problem.
Her armed window starts at 02:48. Tonight the dip came at 02:47. The QSE pulled reserve at 02:45 because she told it to, so tonight nothing was offered that wasn't there. But the window on her sheet, the one she'd been defending as the safe side, would have been a minute late. It's the first night the old fixed window was wrong in the expensive direction, and it's the window she wrote, not the scheduler's forecast.
She circles it. She doesn't move it, because the rule she gave Trey was fourteen nights and she isn't going to break it the first time it costs her something. She sends Corinne a note for the morning.
If the range is right and the armed window isn't, the window has to move before fourteen nights are up, not after.
It's leap day, which means the QSE's monthly template needs a 29th row for February's dips. She checks. The row is there. Somebody updated the template in 2024 and nobody's had to think about it since. She thinks about it for a second, about how many of the things that work on this desk work because someone four years ago didn't skip a step, then closes the file.
Wednesday, March 1
Corinne's office at 08:10 smells like the coffee machine's descaling cycle. Marisol puts the trigger sheet on the desk with last night's line circled and doesn't sit.
Corinne reads it twice. "If the notice said 02:45 and you'd armed at 02:48 anyway, what were you offering that you didn't have?"
"About eighteen megawatts. For roughly a minute."
"Counted as reserve."
"Counted as reserve. The QSE pulled at 02:45, so it didn't actually happen. It would have, on my sheet."
Corinne nods slowly, like someone filing a thing she'll need later. She asks whether a deployment review would have caught it. Marisol says yes, if there'd been a deployment, and that's exactly the case where nobody wants to be explaining a one-minute gap.
They write the change together, Corinne typing, Marisol reading over her shoulder. The armed window no longer starts at a fixed 02:48. It starts at whatever earliest time the T-15 notice gives and ends ten minutes after the latest. On a night like the 29th that's 02:45 to 03:00. On a night where the range comes out 02:50 to 02:56, it's 02:50 to 03:06. The meter trigger stays the authority. The window says when they stop offering reserve. It doesn't say when the dip happens, and it never will.
Corinne adds one more thing. "When the notice doesn't show up by T-10, you go back to the old fixed window and log it as a missed notice. Not a scheduler failure. Not until we know which it is."
"Could be the queue."
"Could be the agent. Could be a network blip on our side. I don't want the campus reading a word in our log that we can't back up."
Marisol agrees with that more than she says.
Corinne types the last line of the change: Fourteen-night count continues. Two ranged nights in, both dips inside range.
"One," Marisol says.
Corinne looks up.
"One ranged night. Last night. Monday was still a single minute, the change wasn't live." She points at the sheet, at Monday's entry, 02:51, one time, no range. "If that goes to the QSE as two, someone counts to fourteen from the wrong place."
Corinne fixes it without comment. One ranged night in, dip inside range. Marisol watches the cursor sit after the period. She'd said two herself, earlier, on the walk over, rehearsing it in her head. She'd have put it in the note if Corinne hadn't typed it first. It was the same kind of loose number she'd been taking apart since February 18: it sounded like a count and nobody had counted it.
Back at the desk she writes the QSE script on an index card in block capitals and tapes it beside the phone.
EARLIEST = RESERVE STOPS COUNTING. DIP IS ANY TIME AFTER.
She adds a column to the trigger sheet with no heading, just a space for a circle. A circle means a night when the dip came before the earliest time. That's the only miss that costs money. Thirteen nights are left, and the forty-one rows are still sitting with the QSE's compliance desk with nothing back yet. Trey says the asynchronous checkpoint, the one that might make the dip shallow enough to vanish into the deadband, is still testing and won't be ready before April. Then she'd be counting dips she can't see on the meter at all.
The circle column is empty. She leaves room for it to fill.