Live LoadOct 30, 2026, 4:12 PM
In the week after a fog trip, Marisol Cantu finds the campus kept telling the grid it held 31 MW of sheddable load for 37 minutes after the load was gone, moves the window's end from a scheduler log to the revenue meter and then to settlement intervals, checks the meter clock against the relays, and catches a routine training checkpoint her own new procedure missed.